Industrial Work

Cenovus Energy –
Foster Creek, Cold Lake AB

 

2013

 

• Supply and installation of an above ground wastewater treatment plant.

 

• Supply and installation of service mains and lift station for a 600 man camp.

 

• Installation of the fire water main extension from the operations centre to the plant.

 

• Co-operation and co-ordination with other contractor’s, safety personnel and subcontractor’s working on site.

 

• Site restoration and clean-up.

 

Cenovus Energy – Silvertip Den, Mechanical Work, Cold Lake AB

 

2012

 

Work on this contract is comprised of the general construction of the following:

 

• Supply and installation of the service mains, lift stations and force mains for the 800 man main camp.

 

• Tie-in of the service stubs to the 500 man temporary camp located at Cenovus - Silvertip Den camp, Cold Lake Air Weapons Range.

 

• Cooperation with other contractor’s, safety personnel and subcontractor’s working on site.

 

• Site restoration and clean-up.

 

Cenovus Energy – Foster Creek Commercial Plant, Nicholls Landing Utility ROW, Cold Lake AB

 

2012

 

The scope of work for this project entailed the installation utilities in a new utility corridor including the following:

 

Deep Utilities:

 

• Survey and layout of new utilities.

 

• Trenching including cutting of existing asphalt.

 

• Installation of deep utilities including bedding compaction and backfill.

 

• Site restoration and clean-up.

 

Sanitary Sewer System:

 

• Supply and install 100 mm HDPE DR 11 butt fusion welded sanitary sewer piping.

 

• Supply and install all required valves and fittings including thrust blocks.

 

• Supply class B bedding, compaction and backfilling.

 

• Line pressure and leak testing.

 

• Supply and installation of a sanitary lift station including all pumps, control systems.

 

Potable Water System:

 

• Supply and installation of 150 mm HDPE DR 11 butt fusion welded water sewer piping.

 

• Supply and install all required valves and fittings including thrust blocks.

 

• Supply class B bedding, compaction and backfilling.

 

• Pressure test, flush and disinfection of water line.

 

Fire Water System:

 

• Supply and install 150 mm, 200 mm, 250 mm HDPE DR 11 butt fusion welded fire sewer piping.

 

• Supply and install all required valves and fittings including thrust blocks.

 

• Supply class B bedding, compaction and backfilling.

 

• Supply and install a new fire hydrant including all valves.

 

• Pressure test and leak test of fire sewer line.

 

Natural Gas Line:

 

• Supply and install 100 mm, 100 mm “yellow jacket”, 50 mm natural gas distribution HDPE butt fusion welded piping including all valves, tees and appurtenances.

 

• Installation of the main distribution line for future connections to the Operations Centre and the Warehouse connection.

 

• Supply and installation of 150 mm bedding sand, compaction and backfill.

 

• Pressure and leak test gas line.

 

Electrical:

 

• Supply empty conduits to accommodate future fibre optic and 25kv lines including all the various fittings and valves.

 

• Installation of thrust blocks on all fittings.

 

• Install class B bedding and backfill native material above bedding.

 

• Install various sizes of empty DB2 PVC conduit from the proposed utility corridor to multiple locations on the site for future installation of fibre optic, power cable and gas pipeline services.

Copyright © 2013, NuEdge Construction, all rights reserved.